当前位置 : 北美新闻

13 upper modules of a 400,000 tons-level marine oil and gas plant delivered in Qingdao 发布日期:2025/1/24 来源:International daily 打印

Offshore Engineering Co., Ltd. recently announced that 13 upper modules of Brazilia-based Petrobras 400,000 tons-level P79 FPSO (Floating Production Storage and Offloading) project contracted by the company were completed and delivered in the Qingdao international high-end equipment manufacturing base, marking a new breakthrough in China’s capacity to manufacture high-end marine energy equipment.

With a total length of 345.3 meters, a molded breadth of 60 meters and the maximum displacement of 400,000 tons, the P79 FPSO, one of the biggest in the globe, will be serviced, once completion takes place, in Buzios, a giant deepwater oil filed in Brazil’s Santos Basin, with an operating water depth of more than 2,000 meters. Offshore Engineering Co., Ltd. is contracted to design, source, build and ship 13 core compressor modules. Weighing some 30,000 tons in total and composed of more than 320,000 structural parts, these modules have involved installation works of 153 large units of mechanical equipment as well as up to 300,000 meters-long electric cables.  (Wang Kai)

图2.jpg

Upper modules of Petrobras P79 FPSO project are built and assembled in Qingdao.

    24小时最新动态

    热点排行

    图片新闻

國際日報 (International Daily News)版權所有. 提醒:業者若未經許可,擅自引用國際日報網內容將面對法律行動. 第三方公司可能在國際日報網站宣傳他們的產品或服務, 您跟第三方公司的任何交易與國際日報網站無關,國際日報將不會對可能引起的任何損失負責. 信息網絡傳播視聽節目許可證:2032302 互聯網新聞信息服務許可證-45122353001  X公網安備 450103024350154號 互聯網出版許可證(X)字003號
©国际日报网版权所有